Kakobuy batch order cutoff worksheet
Work backward from your handover target, mark items ready or deferred, and keep one slow item from holding an entire batch.
Set a handover target and work backward
Choose a handover date for the batch. In your worksheet, put a packing deadline before that target, an inspection deadline before packing, and a latest acceptable warehouse arrival before inspection. Use durations for your own case and write down the timezone. For a hypothetical Friday handover, packing may be due Thursday and inspection complete Wednesday if that is enough time for your plan.
Give each item an arrival range and an owner
Use columns for item, earliest and latest expected arrival, outstanding check, who can follow it up, deadline, and batch decision. If inspection must be complete Wednesday and one item is estimated to arrive between Wednesday and Friday, put that item in a later batch or change your handover target. Record which choice you made beside the item.
Freeze the batch at the cutoff
At the cutoff, filter the worksheet to items with completed checks and no unresolved packing constraints. Copy those IDs to a dated dispatch list. Add a note beside moved items with the next review date. After a change to the batch, ask for the final packaging dimensions if the parcel size affects your plans.
Give linked items a shared release rule
Put any set that only works together under a shared group ID. For example, mark a jacket and coordinating trousers G2 and require both to clear inspection by Wednesday. If just the jacket is ready, your worksheet sends both to the next batch. An unrelated T-shirt can still leave on Friday. Record the grouping before the cutoff so that an automatic ready filter cannot unintentionally split the set.